User Manual

Patient Safeguard System® Patient Bed Installation
UltraClenz, LLC
Page 26
8. Bed Installation Checklist
1. Organize all required equipment & tools
2. Adjust the bed mattress height to 32 inches
3. Disconnect the bed AC power cord from 120vAC
4. Step 1 - Install the Bed Antenna (FAS1540)
5. Step 2 - Install the Dock (FAS1537)
6. Step 3 - Install the ALP Sensor (FAS1542)
7. Step 4 - Install the batteries and Din cable to Bed Beacon, connect to the Dock and place on the floor
8. Connect the ALP Sensor and Bed Antenna to the Dock
9. Step 5 - Set the Bed Beacon/ test Badge range
10. Step 6 - Test the HCW Badge with the Bed Beacon and Dashboard
11. Step 7 - Install the Bed Beacon (FAS1538)
12. Step 8 - Place cable tie holders , route and secure ALP Sensor cable
13. Step 9 - Place cable tie holders , route and secure Bed Beacon cable
14. Step 10 - Place cable tie holders , route and secure Bed Antenna cable