Manual

8
Miracle Water Installation & Operation Manual
Assembly
1. Miracle Water models are factory assembled. During installation, remove the Salt Hole Cover.
Set aside to prevent damage. Check the brinewell to be sure it is secured and vertical (see
Figure 1). Slide Faceplate Cover forward to expose back valve assembly.
2. Lift the brine valve out of the brinewell. Be sure the float stem is parallel to stand tube so seals
will seat properly during operation. Replace the brine valve in the brinewell bottom and install
the Brinewell Cover.
3. Install the brine tank overflow grommet and elbow in the 13/16” diameter hole in the back of the
salt storage tank sidewall.