Manual

E-SECNG-I-0714
6
301-638-3326 • edcoinc.com • sales@edcoinc.com
EQUIPMENT DEVELOPMENT COMPANY
OPERATING CONTROLS
PLEASE NOTE:
Controls shown are for the model indicated.
The location of these controls may vary on the different models.
Due to improvements and changes in the equipment,
the illustrations shown may vary from the actual machine.
ELECTRIC MODEL
Figure 2
Leveling
Lock
Cushioned
Hand Grips
Power On/Off Switch
Electrical Plug
Electrical Motor
Additional
Weight (#21)
Vacuum
Port
Water Hook-Up
and On/Off Valve
Dust Skirt