Installation Guide
1. Post Caps (6)
- 10600
2. Arches (4) - 10702-1
3. Arch Rafters (6) - 10757
4. Left Posts (2) - 10760-1
5. Side Panel Top Horizontal Rails (2) - 10751-1
6. Side Panel Bent Vertical Spindles (46.6 in. / 118.4 cm.) (4) - 10762-1
7.
Side Panel Middle Straight Vertical Spindles (45.5 in. / 115.6 cm.) (2) - 10763-1
8. Side Panel Middle Horizontal Rails (2) - 10754-1
9. Right Posts (2) - 10761-1
10. Side Panel Bottom Horizontal Rails (2) - 10755-1
11. Ground Mounting Extensions (4) - 10845
12. 5/8 in. (16 mm) Self-Augering Screws (48) - 20016
Tools You Will Need
• Cordless Drill
• Level
• Stool or Short Ladder
• Shovel
• Cement (For Installation)
Assembly Time
• Approximately 30 minutes (2 People)
General Information
Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area
approx 10 ft. x 8 ft. (3 m x 2.5 m ) for unobstructed assembling.
• You should not need to use excessive force when assembling components.
Please read through before starting assembly.
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346 (Mon. to Fri. 8:00 AM to 4:00 PM EST).
(UK Tel:
(44) 2038 687160 (Mon. to Fri. 1:00 PM to 10:00 PM GMT).
ASSEMBLY INSTRUCTIONS
The Dublin Arbor / Arch
1
42 in.
(107 cm)
18 in.
(46 cm)
82 in.
(208 cm)
46 in. (117 cm)
12
Not to Scale
8
7
6
5
2
3
1
11
10
45 in.
(114 cm)
9 in. (23 cm)
21 in.
(53 cm)
4
9
V3.2/072517
www.newenglandarbors.com
www.newenglandarbors.co.uk