Installation Guide

1. Pre-Assembled Back Panel with Trellis
(1) - 10895
2. Pre-Assembled Side Panels (2) - 10896
3. Pre-Assembled Front Panel with Posts Connected (1) - 10894
4. Floor Panels (2) - 10897
5.
Post Caps
(4) - 10611
6. 2 1/2” (64 mm) Stainless Steel Screws (4) - 20009-1
7.
1 1/2” (38 mm) Stainless Steel Screws
(8) - 20005
General Information
Read Instructions through carefully before beginning assembly.
When assembling components,
place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
We recommend an area approx 4’x 8’ (1.2 m x 2.4 m) for unobstructed assembling.
You should not need to use excessive force when assembling components.
The Kensington Planter Box & Trellis
Please read through before starting assembly.
Check
Box for These Contents
In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346 (Mon. to Fri. 8:00 AM to
4:00 PM EST).
(UK Tel: (44) 2038 687160 (Mon. to Fri. 1:00 PM to 10:00 PM GMT).
ASSEMBLY INSTRUCTIONS
1
1
4
3
2
V1.2/072717
23 in
(58 cm)
16 in
(41 cm)
18.375 in
(47 cm)
65.3 in
(166 cm)
63.7 in
(162 cm)
20 in
(51 cm)
21.4 in
(54 cm)
16 in
(41 cm)
2 in
(5 cm)
5
6
Not to Scale
7
www.newenglandarbors.com
www.newenglandarbors.co.uk

Summary of content (2 pages)