Warranty

8.7
Have one person stand outside the greenhouse to observe the position of the
roof ridge while the other person installs the B-9 brace. The set screws
should be in the correct position, but if the roof is not completely
straight, loosen the set screws and adjust the brace to raise or
lower the roof line. Secure with two bolts.
8.9
Screw G-3 guer drain into holes in C-1 connectors. Make sure they point down.
8.8
The G-4 trim plates snap into G-1 and G-2 guer proles to hold roof panels in place. Working
from outside, begin at front corner. Position G-4 trim plate over guer and use handle of screw
driver to tap into place. Use two trim plates on each side. Make sure the seams of the trim
plates are ush with each other and to the C-1 connectors at the front. There may be a slight
gap at the rear C-1 connector depending on weather conditions.
B-9
S-2C 2
1
Brace
QTY
QTY
Trim Plate
G-4 4
49 ⅜”
B-9
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM INSIDE.
G-4
W-1
G-1
F-7
C-1
C-1
G-3
G-4
F-7
W-1
G-1
NOTE: View shows alignment
of G-4 and G-1 only.
G-3 4
Gutter Drain
QTY
WWW.RSIWW.COM
38 of 44