Operating Instructions and Installation Instructions

39
ENGLISH
COVERING INSTALLATION CHERIE
Phase A
For proper assembly of the ceramics series on the stove,
proceed as indicated in the sequence (the number in
brackets refers to the exploded view of the stove):
Phase A
This phase presents the stove after being unpacked and
positioned in the room.
Phase B
1) Unscrew the screws to remove the two rear ceramic
fastening profiles (82) (fig. 1)
2) Disassemble the upper front cast iron grille (69)
assembled fitted into place on the stove (fig. 2).
3) Unscrew the screws (fig. 3) to remove the upper side
front cast iron panels on the right and left sides (51 - 49)
(fig. 4)
Phase C
right side ceramic panel assembly (handle side):
4) Open the hearth door
5) Align the apertures present on the front part of the
ceramic panel (47) to the fastening brackets (44) located
on the structure (fig. 5).
6) Insert the ceramic panel in the brackets
7) Rest the rear part of the ceramic panel on the galvani-
sed side of the stove and back on the rear ceramic faste-
ning profile (fig. 6).
8) Close the hearth door
9) Check that there is enough usable space between the
side ceramic panel and the hearth door to permit easy
opening with the handle, and if there is no such space,
disassemble the ceramic panel and adjust as follows:
- loosen the upper bracket and lower bracket screws
- adjust the brackets "just enough"
- tighten the bracket stop screws (fig. 6)
10) Reassemble the ceramic panel according to the
sequence from points 4 to 9; once suitable ideal space is
reached between the ceramic panel and the hearth door,
complete assembly sequence as per point 11.
11) Reposition the upper side cast iron front panel (51)
12) Reposition the rear fastening ceramic right profile (82)
Note: silicone pads have been supplied to be used for
any alignments between the ceramic panel and cast iron
parts, where 3 pads are to be placed at an equal distance
on the base of the lower cast iron front panel.
Phase B
Fig. 1
82
Fig. 2
69
Fig. 3
49 51
Fig. 4