Specifications

CHECK LIST
Read the entire specifications before using this list
Installation and setup
Installation carried out by an authorized TAC which has issued the guarantee and maintenance booklet;
o Room ventilation;
o The smoke duct/flue only receives smoke from the stove;
o The smoke duct has:
no more than 3 bends;
a horizontal section of no more than 2 metres;
a vertical section of at least 1.5 metres;
o The outlet pipes are made of a suitable material (stainless steel is recommended);
o Where pipes cross any flammable materials (e.g. wood) all precautions have been taken to avoid
fire;
The plumbing has been declared as compliant with Italian law No. 46/90 by an authorized technician;
The heatable room dimensions have been suitably calculated considering the heating efficiency of the
heat emitting units (radiators).
Use
The pellets used are good quality and not damp;
The combustion chamber and ash pan are clean and have been placed correctly;
The cleaning rods are operated every day;
The heat exchange pipes are clean (use pipe cleaner);
The pressure (read on the gauge) is about 1 bar.
REMEMBER TO VACUUM CLEAN THE COMBUSTION CHAMBER BEFORE EACH IGNITION
If ignition fails, do NOT repeat ignition before emptying the combustion chamber
Via Mascagni, 7 - 20020 LAINATE (MI) - Italy
Tel. +39 02937621 – Fax +39 0293762400
www.edilkamin.com - mail@edilkamin.com
EdilKamin S.p.A. reserves the right to modify parts of the following manual without prior notice:
cod. 272340 …-05.06/A
20