Specifications
20
CHECK LIST
Read the entire specifications before using this list
Installation and setup
¾ Installation carried out by an authorized TAC which has issued the guarantee and maintenance
booklet
¾ Room ventilation
¾ The smoke duct/flue only receives smoke from the insert
¾ The smoke duct has:
¾ no more than 2 bends;
¾ a horizontal section of no more than 2 metres.
¾ chimney pot beyond the reflux area
¾ the outlet pipes are made of a suitable material (stainless steel is recommended)
¾ where pipes cross any flammable materials (e.g. wood) all precautions have been taken to avoid fire
Presence of air circulation grilles (36 x 9 cm) provided
Use
¾ The pellets used are good quality and not damp
¾ The combustion chamber and ash pan are clean and have been placed correctly
¾ Glass cleaning always takes place when glass is cool.
¾ The firebox smoke closure components (No. 14 and No. 15 in the exploded view) are fitted
correctly.
¾ The door is closed well.
¾ The combustion chamber is correctly inserted in its compartment
REMEMBER TO VACUUM-CLEAN THE COMBUSTION CHAMBER BEFORE EACH
IGNITION
If ignition fails, do NOT repeat ignition before emptying the combustion chamber
EDILKAMIN S.p.A.
Via Mascagni, 7 - 20020 LAINATE (MI) - Italy
Tel. +39 02937621 – Fax +39 0293762400
www.edilkamin.com - mail@edilkamin.com
EdilKamin S.p.A. reserves the right to modify parts of this manual without prior notice cod. n: 288890 2.06-07/A