Technical data

35
ENGLISH
COVERING ASSEMBLY
TINY (the KELLY model comes pre-assembled)
Hardware included:
no. 4 Threaded rod M8x45
no. 4 Ceramic cap fixing stud
nr. 6 M6 x 8 Screws with false washer
no. 2 Self-tapping screws 4.2 x 9.5
no. 16 M6 x 12 Screws with false washer
nr. 4 Washers Ø 24 hole Ø 8
nr. 14 Thicknesses (12 for use and 2 spare)
no: 4 Adjustment pin
nr. 2 Rubber thicknesses for ceramic grout
no: 8 Grub screw
nr. 2 Brackets for attachment to wall with pins and screws
Fig. 1
This figure represents the stove after it has been unpac-
ked.
Fig. 2/3
Note:
The stove is delivered with the metal part of the side
plate coverings already assembled (fig. 2). The two
corner ceramic components (fig. 3) must be assembled
as follows:
To achieve an optimal result some adjustments must be
made in order to align the ceramic components (fig. 3) to
the metal parts (fig. 2) as best as possible.
SIDE COVERINGASSEMBLY:
CORNER CERAMIC ELEMENTS:
Fig. 4/5
Apply 3 pads (a,b,c) on the threaded inserts encased in the
ceramic component as shown in figure 4.
Place each corner element on large enough surface and
place a cloth or similar item under them to prevent scrat-
ching.
Overlay the metallic side (fig. 5) after having disassem-
bled it.
Fig. 6
Tighten the 3 Allen screws (d, e, f) on the metal side into
the relative bushings inserted in the ceramic side.
Tightening the 3 M6 x 12 screws (d,e,f), the ceramic side
will move closer to the metal side: stop tightening when
the ceramic side is flush against the metal side. Place the
spacers (g e h) between the ceramic and metal sides in
order to achieve a precise interspace, as shown in figure
6.
ATTENTION!!! Do not screw using force; work in an
extremely delicate manner otherwise the threaded
inserts may come out of the ceramic side.
Fig. 1
Fig. 5
Fig. 6
Fig. 2
Fig. 4
(a)
(b)
(d)
(e)
(f)
(g)
(h)
(c)
spessori
Fig. 3
             