Manual

Assemble two (2) 48” bottom post with one (1) brace. Skipping
one slot from the bottom of the post (see figure A), place the
rivets into post with the slot pointing down, and with the shelf
ledge of the brace facing up (see figure B). Tap lightly to seat
rivets. Repeat with two (2) 48” bottom post and one (1) brace.
Assemble the two (2) end units with two (2) beams (see figure
C). Skip one hole from the bottom of post, tap lightly to seat
rivets.
Assembly Instructions for UR184884WR6
Assembly Instructions for UR184884WR6
Assembly Instructions for UR184884WR6
Continue working by adding the second level using two
(2) beams and two (2) braces in the post slots of your
desired location. Again place the rivets of the beams
and braces into the post slots with the shelf ledge facing
up and tap lightly to seat the rivets.
IMPORTANT NOTE : Make sure all rivets are fully seated into the post slots.
IMPORTANT NOTE : Make sure all rivets are fully seated into the post slots.
IMPORTANT NOTE : Make sure all rivets are fully seated into the post slots.
Continue by adding the fourth, fifth and sixth level to the
unit using six (6) beams, six (6) braces. After each level
is in place, tap lightly to properly seat the rivets. Finally
add the wire decking to each level using one (1) piece
per level.
Step
1
Step
2
Step
3
Step
4
Figure A
Figure B
Figure C
Shelf Ledge
Brace
Bottom
Post
Tap Lightly
Beam
Figure C
Note:
Post are
directional.
The slot
must point
down.
Post Slot Points Down
Note:
Post are directional. The slot
must point down.
Top Post
Figure D
Post Coupler
Bottom Post
Assemble the four (4) 36” top post to the bottom post by
using four (4) of the post couplers. Place the couplers on
the top of the bottom post, and the bottom of the top post
and tap down to properly seat (see figure D). Continue
by adding the third level of beams and braces just below
the post couplers. Again tap lightly to seat the rivets.
Wire Decking