Installation Manual Original Instructions - IW5001
Installation Manual 1 General Operator and Supervisor Information Signal Word Definition Signal Word Panel 2 Installation Requirements Environmental Requirements at Work Station Electrical Requirements at Work Station Electrical Performance Specification 3 Installing the Ironworker Receiving the Ironworker Unpacking/Moving the Ironworker Anchoring the Ironworker Electrical Connection of the Ironworker Installing the Ironworker Starting Box Wiring Powering Up the Ironworker Table of Contents Signal Word
Installation Requirements • This manual provides installation information for the following Edwards Ironworkers: 25 Ton 40 Ton 50 Ton 55 Ton 60 Ton 65 Ton 100 Ton 100 Ton DX 120 Ton Elite 110 Elite 110/65 D.O. Locate your Ironworker directly adjacent to your power supply. Confirm that power supply is not connected in series with other machinery. Provide dedicated electrical socket and circuit breaker for each Ironworker installed.
Starting Box Wiring Provide the electrical schematic wiring diagram (located within the Ironworker control box) to your Electrician prior to initiating the electrical hookup of the machine. Power up the Ironworker With all stations clear of tools, tooling or debris, power up the Ironworker by depressing the green button on the starter box. With the power on, your machine will return to a neutral position. Cycle the machinery by depressing the foot pedal.
S P.O. Box 166, Albert Lea, MN 56007 800-373-8206 www.edwardsironworkers.