Troubleshooting Guide
STEP 4-CONTINUED
WHEN MEASURING VOLTAGE ACROSSS THE TOP OF THE ELEMENTS YOU
WILL GET A VOLTAGE READING.
REMEMBER– YOU MUST HAVE WATER RUNNING IN ORDER FOR THE ELE-
MEMTS TO ACTIVATE AND DRAW POWER.
IF YOUR LED DISPLAY IS LIT AND YOU HAVE WATER RUNNING THROUGH
THE UNIT AND HAVE 0 VOLTAGE READING WHEN MEASURING WITH
PROBES ON EACH SCREW -PERFORM THE SAME TEST, BUT THIS TIME
PLACING ONE PROBE ON ONE SCREW AND THE OTHER PROBE TO
GROUND. DO THE SAME ON THE OTHER SCREW. IF YOU ARE GETTING
VOLTAGE READINGS WHEN TESTING ON ONE SCREW TO GROUND BUT
NO VOLTAGE WHEN MEASURING FROM SCREW TO SCREW YOUR ELE-
MENT MIGHT BE BAD AND MUST BE REPLACED.
NOW– REMEMBER YOU MUST HAVE SEVERAL HOT WATER APPLICATIONS
RUNNING SUCH AS A TUB, SHOWER AND SINKS TO ENSURE THE UNIT
FORCES THE OTHER ELEMENTS TO DRAW POWER.
STEP 4-B
THIS TEST IS TO MEASURE AMPERAGE DRAW ON EACH ELEMENT. THIS
IS DONE BY USING THE CLAMP PORTION OF THE METER AND CLAMPING
AROUND THE RED WIRE THAT COMES FROM THE TOP OF THE BLACK
ROUND THERMOSTATS LOCATED ON THE SILVER PLATE TO THE HEAT-
ING ELEMENT.
WHILE WATER IS RUNNING GET THE AMPERAGE DRAW FOR EACH ELE-
MENT. AGAIN FROM RIGHT TO LEFT SINCE ELEMENTS ACTIVATE IN SE-
RIES. THE FIRST ELEMENT WILL DRAW FULL AMPERAGE BEFORE THE
SECOND ELEMENT STARTS TO DRAW ANY AMPERAGE.
IT IS IMPORTANT TO FOLLOW THESE STEPS AND WRITE DOWN THE
READINGS/RESULTS.
THESE STEPS WILL ASSIST IN A QUICK RESOLUTION TO ANY ISSUES
YOU MIGHT HAVE WHEN CONTACTING OUR TECHNICAL SUPPORT
DEPARTMENT.
THE LAST PAGE IS DESIGNED TO DOCUMENT ALL READINGS
SHOULD YOU HAVE ANY QUESTIONS BEFORE, DURING OR AFTER IN-
STALLATION YOU CAN CONTACT OUR TECHNICAL SUPPORT DEPARTMENT
TOLL FREE AT 877-474-6473
Email: info@eemaxinc.com
Or visit our web site at
www.eemaxinc.com