Installation Guide and Manual

22
ECO Testing Points
Test ECO’s (electric cut offs):
To check all ECO’S simultaneously measure from
COMMON TEST POINT to 3 CHAMBER (or 6
CHAMBER) for continuity. If no continuity, then
check across each ECO individually.
ECO’s may be manually reset after they have cooled.
Run cold water and press the stem to reset. Water
may need to run for a few minutes. Check continuity
to confirm a reset ECO.