Installation Instructions User guide

EFCO 2009 Page 19
Series 8700 / 8800 Unitized Curtain Wall Installation Instructions
Section 4 - Dynamic Starter Sill Preparation and Installation
5. Starting at the jamb, place the starter sill base into the opening hard on the condition in the final position, excluding elevation. Match drill the substrates at
the anchor locations and apply the anchors allowing for shim space under the starter sill base. Refer to the approved shop drawings for type, size, and
specific anchor details. Shim the starter sill base to the proper elevation height. Ensure that the starter sill base is true, level, and plumb.
6.
When applying anchor bolts to the starter sill base, pre-fabricated serrated washers (17D3) must be used. The serrated washers will lock the starter sill base
into position when the anchor bolt is tightened. See Figures 25, 26 and 27. After verifying the final position of the starter sill, secure the anchor bolts as
required.
7.
Put a temporary shim between the end dam and the condition to protect the end dam during unit installation. The required shim thickness will vary due to
field tolerances and project specific joint size requirements, but a minimum of 1/2” is recommended. Remove the shim after unit installation.
Figure 25
Figure 26
Figure 27
Apply shim
between end
dam and
condition.
Pre-fabricated oversized
anchoring slot.
Serrated Washer
Anchor bolts as required.
Shim starter sill
base to proper
elevation height.
Shim starter sill base to
proper elevation height.
Anchor bolts as required.
Starter Sill Base
Starter Sill Base
Apply shim between end
dam and condition.
Serrated Washer
Shim starter sill base to
proper elevation height.
Starter Sill Base
Anchor bolts as required.
End dam
End dam