Installation Instructions User guide
Table Of Contents
- Table Of Contents
- Section 1: General Notes And Guidelines
- Section 2 - Parts Identification
- Section 3 - Static Starter Sill Preparation and Installation
- Section 4 - Dynamic Starter Sill Preparation and Installation
- Section 5 - Dynamic Starter Sill Anchor Installation
- Section 6 - Intermediate Floor Slab Anchor Installation
- Section 7 - Unit Inspection and Preparation for Installation
- Section 8 - Setting Units at Static Starter Sills
- Section 9 - Setting Units at Dynamic Starter Sills
- Section 10 - Setting Typical Intermediate Units
- Section 11 - Setting Assembled (One Piece) Corner Units
- Section 12 - Applying Critical Seals
- Section 13 - Applying Typical Perimeter Seals
- Section 14 - Deglaze / Re-glaze Procedures - Captured System
- Section 15 - Deglaze / Re-glaze Procedures - SSG System
![](/manual/efco/8800/installation-instructions-user-guide-english/images/img-39.png)
EFCO 2009 Page 39
Series 8700 / 8800 Unitized Curtain Wall Installation Instructions
Once the units are set, and final
adjustments are made, turn the
washer so that the serrations
align and secure anchor bolts.
Section 8 - Setting Units at Dynamic Starter Sills
14. Adjust the starter sill anchor so that it aligns with the vertical. The anchor can be slid from side to side on the insert. Ensure the anchor is pressed against
the back of the starter sill. Rotate the washers at the starter sill anchor so that the serrations align with the serrations in the starter sill anchor.
15. Secure the anchor bolts at the starter sill anchor, locking the anchor in place.
Figure 84
Figure 85
Remove the shims from
between the unit sill and
the starter sill.
Once the units are set, and final
adjustments are made, turn the
washer so that the serrations
align and secure anchor bolts.
17C6 Starter Sill
Anchor with
bituminous coating.