Installation Instructions User guide
Table Of Contents
- Table Of Contents
- Section 1: General Notes And Guidelines
- Section 2 - Parts Identification
- Section 3 - Static Starter Sill Preparation and Installation
- Section 4 - Dynamic Starter Sill Preparation and Installation
- Section 5 - Dynamic Starter Sill Anchor Installation
- Section 6 - Intermediate Floor Slab Anchor Installation
- Section 7 - Unit Inspection and Preparation for Installation
- Section 8 - Setting Units at Static Starter Sills
- Section 9 - Setting Units at Dynamic Starter Sills
- Section 10 - Setting Typical Intermediate Units
- Section 11 - Setting Assembled (One Piece) Corner Units
- Section 12 - Applying Critical Seals
- Section 13 - Applying Typical Perimeter Seals
- Section 14 - Deglaze / Re-glaze Procedures - Captured System
- Section 15 - Deglaze / Re-glaze Procedures - SSG System
EFCO 2009 Page 50
Series 8700 / 8800 Unitized Curtain Wall Installation Instructions
Section 10 - Setting Typical Intermediate Units
Figure 110
22. Compare the unit to established bench marks and move the unit side to side to position it laterally to the required location. At the stacked mullions the
mullion width should be 3”.
23. Adjust the unit for plumb, parallel to the plane of the wall, by sliding the slab anchor forward or backward until the unit is plumb. See Figure 110.
24. Rotate the serrated washers where the serrations align with the serrations in the slab anchor and secure the anchor bolts.
25. Tighten the jack bolts of the mullion anchors just tight enough so that the shims at the stack joint below can be removed and the unit stays in the nominal
position. See Figure 103 on page 47. Remove the shims between the sill and the starter sill that were applied in step 16.
17D4 Slab
Anchor
Hook Anchor
Once the units are set, and final
adjustments are made, turn the
washer so that the serrations
align and secure anchor bolts.