Installation Instructions User guide
Table Of Contents
- Table Of Contents
- Section 1: General Notes And Guidelines
- Section 2 - Parts Identification
- Section 3 - Static Starter Sill Preparation and Installation
- Section 4 - Dynamic Starter Sill Preparation and Installation
- Section 5 - Dynamic Starter Sill Anchor Installation
- Section 6 - Intermediate Floor Slab Anchor Installation
- Section 7 - Unit Inspection and Preparation for Installation
- Section 8 - Setting Units at Static Starter Sills
- Section 9 - Setting Units at Dynamic Starter Sills
- Section 10 - Setting Typical Intermediate Units
- Section 11 - Setting Assembled (One Piece) Corner Units
- Section 12 - Applying Critical Seals
- Section 13 - Applying Typical Perimeter Seals
- Section 14 - Deglaze / Re-glaze Procedures - Captured System
- Section 15 - Deglaze / Re-glaze Procedures - SSG System
EFCO 2009 Page 53
Series 8700 / 8800 Unitized Curtain Wall Installation Instructions
Figure 114
Figure 115
6. Refer to “Section 8 - Setting Units at Static Starter Sills” on pages 32 - 36 when installing corner units at the static starter sill locations. The inside 90° corner
static starter sill condition is shown below. See Figure 114. The outside 90° corner static starter sill condition is shown in Figure 115.
Section 11 - Setting Assembled (One Piece) Corner Units
Static Starter Sill
Static Starter Sill