Installation Instructions User guide
Table Of Contents
- Table Of Contents
- Section 1: General Notes And Guidelines
- Section 2 - Parts Identification
- Section 3 - Static Starter Sill Preparation and Installation
- Section 4 - Dynamic Starter Sill Preparation and Installation
- Section 5 - Dynamic Starter Sill Anchor Installation
- Section 6 - Intermediate Floor Slab Anchor Installation
- Section 7 - Unit Inspection and Preparation for Installation
- Section 8 - Setting Units at Static Starter Sills
- Section 9 - Setting Units at Dynamic Starter Sills
- Section 10 - Setting Typical Intermediate Units
- Section 11 - Setting Assembled (One Piece) Corner Units
- Section 12 - Applying Critical Seals
- Section 13 - Applying Typical Perimeter Seals
- Section 14 - Deglaze / Re-glaze Procedures - Captured System
- Section 15 - Deglaze / Re-glaze Procedures - SSG System
EFCO 2009 Page 55
Series 8700 / 8800 Unitized Curtain Wall Installation Instructions
Figure 120
6. Refer to “Section 10 - Setting Typical Intermediate Units” on pages 45 - 51 when installing corner units at intermediate floor slab locations. The inside 90°
corner anchor condition is shown below. See Figure . The outside 90° corner anchor condition is shown in Figure .
Section 11 - Setting Assembled (One Piece) Corner Units
Figure 119
Lifting Lug
Lifting Lug
17D4 Slab
Anchor
17D3 Serrated
Washers
Hook Anchor
Unit dead load anchor
17D3 Serrated
Washers
Hook Anchor
Unit dead load anchor
17D4 Slab
Anchor