Installation Instructions User guide
Table Of Contents
- Table Of Contents
- Section 1: General Notes And Guidelines
- Section 2 - Parts Identification
- Section 3 - Static Starter Sill Preparation and Installation
- Section 4 - Dynamic Starter Sill Preparation and Installation
- Section 5 - Dynamic Starter Sill Anchor Installation
- Section 6 - Intermediate Floor Slab Anchor Installation
- Section 7 - Unit Inspection and Preparation for Installation
- Section 8 - Setting Units at Static Starter Sills
- Section 9 - Setting Units at Dynamic Starter Sills
- Section 10 - Setting Typical Intermediate Units
- Section 11 - Setting Assembled (One Piece) Corner Units
- Section 12 - Applying Critical Seals
- Section 13 - Applying Typical Perimeter Seals
- Section 14 - Deglaze / Re-glaze Procedures - Captured System
- Section 15 - Deglaze / Re-glaze Procedures - SSG System
EFCO 2009 Page 58
Series 8700 / 8800 Unitized Curtain Wall Installation Instructions
1. The typical jamb and starter sill are as shown below in Figures 125 and 126. The line of sealant at the jamb will follow the front edge of the back member.
2. The condition at the head is job specific. Refer to approved shop drawings for sealant details.
3. The caulk joint at the starter sill is located at the exterior part of the starter sill and must return at the jambs to marry with the perimeter caulking of the jambs.
See Figure 129 on the following page.
Section 13 - Applying Typical Perimeter Seals
Backer Rod and
Perimeter Seal
Backer Rod and
Perimeter Seal
Figure 125
Figure 126