Series 5600 Interior glazed curtain wall Installation Instructions Part NO.
Series 5600 Inside Glazed Installation Instructions SECTION TABLE OF CONTENTS PAGE I. General Notes and Guidelines ……………………………………………….. 3-4 II. Mullion Anchor …………………………..………………………………………… 5 III. Anchor Installation…………………………………………………………………6-7 IV. Perimeter Application……………………………………………………………..8-9 V. General Frame Assembly Notes……………………………………………….10 VI. Frame Assembly - Sill....………………………………………………………… 11 VII. Frame Assembly – Intermediate Horizontal……………………………… 12 VIII.
Series 5600 Inside Glazed Installation Instructions Section I: General Notes & Guidelines I. II. HANDLING / STORING / PROTECTING ALUMINUM - The following precautions are recommended to assure early acceptance of your products and workmanship. A. HANDLE CAREFULLY - Store with adequate separation between components so the material will not rub together. Store material off the ground. Protect materials against weather elements and other construction trades. B.
Series 5600 Inside Glazed Installation Instructions Section I: General Notes & Guidelines F. Follow EFCO framing installation and glazing instructions. G. Verify contents of all material shipments received upon arrival. Verify quantity and correct finishes. NOTIFY EFCO IMMEDIATELY OF ANY DISCREPANCIES OR DAMAGE, THAT MAY HAVE OCCURRED. H. Throughout these instructions the term “SEALANT” will appear.
Series 5600 Inside Glazed Installation Instructions Section II: Mullion Anchors Anchor at head allows for movement (refer to shop drawings) “T” Anchor at Intermediate mullion The erector must supply and apply bond breaker tape across the face of the anchor to prevent three-sided adhesion Line of critical perimeter sealant is shown dotted “F” Anchor at jamb condition Type, Size, and Location of anchor bolts as shown on shop drawings per structural requirements Notch sill members to clear the shear block
Series 5600 Inside Glazed Installation Instructions Section III: Anchor Installation Apply Appropriate Anchors A.) B.) C.) Attach anchors to the mullion with temporary alignment screws as shown in the detail below. Install the vertical mullions into position and attach anchors to the building structure per approved shop drawings. After final alignment of the mullion, align drill the mullion through the best hole location available.
Series 5600 Inside Glazed Installation Instructions Section III: Anchor Installation 1" MIN. A steel plate is factory welded to the steel channel and is sized per job requirements. Refer to the shop drawings 1" MIN. See page #6 of 23 Dead-Load Anchor Bolted to building structure Size and locate anchor bolts based on the job conditions and the structural requirements.
Series 5600 Inside Glazed Installation Instructions Section IV: Perimeter Application Determine Installation Method A.) Two types of perimeter applications are possible, including “F” perimeter anchors or mullion anchors with continuous pressure plate pocket fillers. “F” perimeter anchors should only be used in small “punched” openings that can be assembled on the floor and set into the opening.
Series 5600 Inside Glazed Installation Instructions Section IV: Perimeter Application B.) First attach the vertical pressure plates and then the horizontal pressure plates into position using #13 X 5/8” stainless steel hex washer head screws. Locate screws at 6” O.C. and at a maximum of 3” from the ends of each pressure plate. Torque screws to 80 inch-pounds. When possible, work from the center outward on the horizontals and from the sill upward on the verticals. C.
Series 5600 Inside Glazed Installation Instructions Section V: General Frame Assembly Notes Step #1 Assemble Frame Components A.) Assemble shear blocks, splice sleeves, anchors, etc., to the mullions as required per approved shop drawings. B.) Apply sealant to the shear blocks and attach horizontal rails. Fasten with screws in hidden locations where possible. Note: On long runs, check overall frame dimensions at every fifth opening to avoid dimensional build-up.
Series 5600 Inside Glazed Installation Instructions Section VI: Frame Assembly - Sill #8 X ¾” Phillips F.H. Tek2 (SS) “Butter” joint plug with sealant on contact surfaces and insert between vertical and horizontal tongue. Notch head/sill horizontal members to clear the shear block and anchor bolt heads SILL Apply sealant to the face of the shear block at each horizontal mullion. Apply sealant over the joint plug and tool smooth.
Series 5600 Inside Glazed Installation Instructions Section VII: Frame Assembly - Intermediate Horizontal Apply joint plug. See below Seal the horizontal pressure plate to the vertical pressure plate so they are air and water tight.
Series 5600 Inside Glazed Installation Instructions Section VIII: Frame Assembly – Head Horizontal Apply sealant to the face of the shear block at each horizontal mullion #8X ¾” HWH TEK Head Horizontal Apply joint plug. Head Horizontal Seal the horizontal pressure plate to the vertical pressure plate so they are air and water tight. Tool sealant over the top and bottom of the joint plug. Apply mullion covers prior to glazing if desired. Head Horizontal EFCO CORPORATION 6/2012 PART NO.
Series 5600 Inside Glazed Installation Instructions Section IX: Glazing Preparation Step #1 Install Joint Plugs A.) Seal the vertical gasket raceway and slip in the joint plugs at the horizontal to vertical SECTION "A-A" intersections as indicated. Prior to installing the mullion plugs, fill the gasket raceway and tongue raceway with sealant to close off the void at the joint plug locations.
Series 5600 Inside Glazed Installation Instructions Section IX: Glazing Preparation Step #2 Install Gaskets into Mullions NOTE: Clean all glazing pockets prior to glazing. This is necessary to avoid clogging the weep system as well as to prevent staining of the exterior metal and glass surface. A.) Remove glazing gaskets from the reel and allow to relax and shrink. B.) Apply sealant into the raceway a minimum of 2” in each direction from the corner on the exterior side of the glazing pocket.
Series 5600 Inside Glazed Installation Instructions Section IX: Glazing Preparation E.) Seal all gasket corners and butt joints as indicated below. Preset Gaskets To insure a snug fit, seal all gasket corners by pulling the horizontal gasket back, sealing the ends, and pressing into the vertical gasket Intermediate Horizontal (Head and Sill Similar) Step #3 Install Setting Blocks A.) Position and install setting blocks as directed on the approved shop drawings. EFCO CORPORATION 6/2012 PART NO.
Series 5600 Inside Glazed Installation Instructions Section IX: Glazing Preparation Step #4 Install Glazing Adaptors A.) Prior to installing the glazing adaptors, seal the entire gasket raceway with sealant. B.) Snap glazing adaptors in place into sealant starting with the verticals. Allow at least 1/8” clearance from the bottom of the glazing adaptor to the top of the joint plug to allow for weepage. C.) Butter the ends of the horizontal adaptors prior to setting into position.
Series 5600 Inside Glazed Installation Instructions Section X: Glazing Installation Step #1 Install Glazing Materials A.) Install the proper glazing product into the opening using section cups to hold the infill above the sill horizontal and set the jamb side of the glass into the deep pocket. Swing the opposite side of the glass into the shallow pocket. Gently lower the material onto the setting blocks with the exterior face of the glass pushed up against the exterior gasket.
Series 5600 Inside Glazed Installation Instructions Section X: Glazing Installation Step #2 Install Glazing Bead Apply a small bead of sealant in the bead reglet Butter the side of the mullion where the glazing bead comes into contact with sealant Intermediate Horizontal Step #3 Install Wedge Gasket Drive the wedge gaskets into position starting at the center of the D.L.O.
Series 5600 Inside Glazed Installation Instructions Section X: Glazing Installation Step #5 Install Glazing Bead at Head Tool sealant into joint Butter the side of the mullion where the glazing bead comes into contact with sealant Thoroughly apply sealant to the ends of the glazing bead Head Horizontal Step #6 Install Wedge Gasket Drive the wedge gaskets into position starting at the center of the D.L.O.
Series 5600 Inside Glazed Installation Instructions Section X: Glazing Installation Step #8 Install Side Blocks A.) Install and position side blocks in the jamb pocket cavity at the approximate midpoint as indicated. SECTION "A-A" A “W” type jamb spacer block at approximate midpoint of glass D.L.O. 1” Insulated Glass A B SECTION "B-B" “W” type jamb spacer block at approximate midpoint of glass D.L.O. ¼” Glass B EFCO CORPORATION 6/2012 PART NO.
Series 5600 Inside Glazed Installation Instructions Section X: Glazing Installation Stool Horizontal Tape top of gasket assembly to mullion face when using molded corners Infill Floor line Ceiling horizontal FIG. A Molded corners Drop-in Glazing FIG. C Step #9 Glazing the Spandrel Areas at Floor Lines A.) The top of each spandrel glass should consist of a horizontal assembly with bolt-on pressure plate as shown in FIG. “D” below. B.
Series 5600 Inside Glazed Installation Instructions Section X: Glazing Installation Re-glaze of Spandrel Glass From Exterior A.) Remove the broken or damaged glass and gasket material. B.) Remove the pressure plate at the top of the glass lite. See FIG. “D”. C.) Re-install the preset gasket to the interior side of the glass pocket. (Replace the gasket if damaged). D.) Set the replacement glass down on top of the pre-located setting blocks and tight against the preset gasket. E.
Series 5600 Inside Glazed Installation Instructions Section X: Glazing Installation Re-glaze of Spandrel Glass From Interior A.) The vision lite above the damaged or broken spandrel glass must be deglazed. 1. Remove the interior wedge. 2. Remove the glazing bead at the head. 3. Remove the glass. 4. Remove the horizontal at the top of the damaged or broken spandrel glass. B.) Remove the damaged or broken glass and glazing material from the spandrel area. C.
Series 5600 Inside Glazed Installation Instructions Section XI: Vertical Splice Joints Step #1 Locate Splice Joints A.) Splice joints should occur at the spandrel areas (if possible). Refer to Approved Final Shop Drawings for actual locations. B.) Depending on the specific job requirements, splice sleeves may be shop or field assembled in the top of the lower mullion. If materials are field fabricated, use the following assembly instructions.
Series 5600 Inside Glazed Installation Instructions Section XI: Vertical Splice Joints Upper mullion is “stabbed” onto lower mullion splice Splice sleeve will vary with the system mullion depth Apply “Bond Breaker Tape” to splice and insert into lower mullion Seal between mullion back members and tongues, then tool sealant into joint and smooth. After infill is in place, apply the pressure plates and seal between pressure plates, then tool sealant into joint and smooth.
Series 5600 Inside Glazed Installation Instructions Section XII: Exterior Cover Installation Step #1 Apply Exterior Covers A.) Locate and apply vertical covers as shown on the Approved Final Shop Drawings. Engage one side, then use the mallet and block to engage the opposite side. B.) Center the horizontal snap cover in the opening and apply it in the same manner. Gaps at the ends should be split equally and are to allow for thermal movement and weepage. Note: Exterior horizontal snap covers are cut D.
Series 5600 Inside Glazed Installation Instructions Section XII: Exterior Cover Installation Step #2 Secure Exterior Covers A.) On vertical covers 1” in depth and over, it is necessary to install a 1/16” X 5/16” roll pin at the horizontal cover locations to prevent slippage. B.) On horizontal covers 1” in depth and over, it is necessary to mechanically attach the cover to the pressure plate similar to what is shown below to insure against disengagement of cover from pressure plate. 1” and up.
Series 5600 Inside Glazed Installation Instructions Section XIII: Reinforcing Step #1 Install Reinforcing Steel A.) At large spans or in high wind load areas, internal steel reinforcement may be necessary. Reinforcement steel requirements will vary from job to job. Please reference the Approved Final Shop Drawings for steel reinforcement requirements. B.) When steel reinforcement is factory installed into the mullions, fasteners will be used to prevent damage or slippage of the steel during shipment.