Operation Manual

Operation
Page 60
4. Next, insert the off-heat tube.
3.2.6 Connecting the charge line and data line
1. Insert the plug on the data line (1)
into the connection socket marked "
operating panel " on the EFOY fuel
cell.
2. Insert the plug on the loading cable
(2) into the socket connection
provided on the EFOY fuel cell.
Remote
Control
Data
Interface
INFO:
The device switches on as soon as
the battery charge line is plugged
in and the EFOY fuel cell is
connected to the battery.
3.2.7 Operating panel
menu
ok
!
1. On/Off
2. Menu
3. Back
4. Scroll up through menu
5. Scroll down through menu
6. Confirmation/OK
7. Red LED lights up to indicate a fault
English
www.busse-yachtshop.de | info@busse-yachtshop.de