Installation & Assembly
ASSEMBLY INSTRUCTION
Eichholtz B.V. l Delfweg 52 l 2211 VN Noordwijkerhout l P.O. Box: 23, 2160 AA Lisse l The Netherlands l www.eichholtz.com
1 ZOOM
111531 CHANDELIER GIGI L
A
B
C
D
CEILING
Turn off the electricity supply at the main circuit panel before installing.
Do not connect the electricity supply until your luminaire is fully assembled
and installed.
Fix the ceiling bracket (A) to the ceiling by using mounting plugs and
screws suitable to your ceiling type.
Place or hold the lamp in an elevated position in such a way that the wires
can freely reach the ceiling junction box.
Thread the wires through the components (suspension eye, retaining nut,
ceiling canopy) and connect the 3 power wires according to their colours.
Brown is the live wire, blue is the neutral wire, green/yellow is the earth
wire.
Screw the suspension eye (C) (with retaining nut attached) to the ceiling
bracket and fix it securely by tightening the retaining nut (D).
Place the bulbs. Place the glass and steel tubes according to the schedule.
CARE INSTRUCTION
Wipe clean with soft, dry cloth.
Always avoid the use of harsh chemicals or abrasive cleaners as they may
cause damage to the fixture’s finish.
12X Steel
C
250
12X Glass
F
250
12X Glass
B
230
12X Steel
E
230
12X Steel
A
210
12X Glass
D
210