Drawing : - TPC450
Issue : - 1
Date : - 18/01/16
OPERATION
The following procedures should be followed to test the K100H for correct
operation:
1. After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded electrical outlet.
2. Setting the Digital Humidistat
The Digital Humidistat is factory preset to give the optimum
level of control. Only adjustment of the desired set point is
required.
During normal operation, the display shows the current % Relative
Humidity within the space being conditioned.
The required humidity level can be set as follows:
Press the “S” button once to access the set point
Press the or button to change the display to the
desired Humidity level
Press the “S” button again to save the set point The
control returns to displaying the current % Relative
Humidity
3. Check dehumidification process as follows:
A. Place unit on a level surface.
B. Start up unit by turning the ON/OFF switch to ON
C. Check that the compressor is running.
D. Leave the machine running for 15 minutes.
E. Observe the evaporator coils through the rear upper grill, to
confirm frost operation.
TO ENSURE CONTINUED FULL EFFICIENCY OF THE
DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE
PERFORMED AS FOLLOWS: