Installation Guide

CEILING RINGS
installation instructions:
Loctite Power Grab
-elastomeric adhesive caulk
caulking gun
nail gun
nishing nails
extra ne sandpaper
putty knife
TOOL & MATERIAL
CHECKLIST
IMPORTANT INFO
It is highly recommended that you paint/nish our ceiling rings before you install them.
Once installed, you can apply any necessary touchup paint/nish.
Clean installation surface and back of ceiling ring of all dirt and dust with a clean cloth
or sponge.
Make sure that the surface and the back of the ceiling ring are completely dry before
attempting installation.
Measure and mark the location where the ceiling ring is going to be installed.
SAFETY INSTRUCTIONS
Make sure to use the correct tools recommended.
Wear safety goggles.
Follow xture, power tools, and paint manufacturers’ instructions and users manuals.
Use common sense and follow good construction practices.
WHOLE INSTALLATION
1. Lay the ring face down on a soft surface that will not scratch/dent the medal-
lion detail.
2. Apply a 1/2” bead of adhesive caulk(we strongly reccomend Loctite Power
Grab) all the way around the back edge of the ring.
3. Gently press the ring up against the ceiling or wall.
4. When pressing the ring up against the ceiling or wall, some adhesive caulk
will seep out. Smooth excess caulk around the ring with a nger or the putty
knife and apply extra caulk that is needed to ll in any gaps.
5. Wipe off any excess adhesive caulk with a sponge or damp rag.
6. Larger rings will need to be installed with nails in addition to the adhesive.
Note: If you would like to remove the nails after the adhesive sets, leave at
least 1/2” of the nail sticking out from the ring, so you can easily pull it out.
QUARTER INSTALLATION
1. Lay the pieces of the ring face down on a soft surface that will not scratch/
dent the medallion detail.
2. Miter the ends of the peices so that the form a circle and the details match up.
3. Apply a 1/2” bead of adhesive caulk(we strongly reccomend Loctite Power
Grab) all the way around the back edge of the ring.
4. Gently press the ring up against the ceiling or wall.
5. When pressing the ring up against the ceiling or wall, some adhesive caulk
will seep out. Smooth excess caulk around the ring with a nger or the putty
knife and apply extra caulk that is needed to ll in any gaps.
6. Wipe off any excess adhesive caulk with a sponge or damp rag.
7. Larger rings will need to be installed with nails in addition to the adhesive.
Note: If you would like to remove the nails after the adhesive sets, leave at
least 1/2” of the nail sticking out from the ring, so you can easily pull it out.
FINISHING
NAILS
CEILING RING
FINISHING
NAILS
CEILING RING
QUARTERS
WHOLE INSTALLATION
QUARTER INSTALLATION

Summary of content (1 pages)