Operating Instructions and Installation Instructions
Maintenance
Cleaning the condensate receptacle
Cleaning and refilling the syphon
32
Cleaning the condensate receptacle
Remove the inspection hatch (2) to
access the inside of the condensate
receptacle;
Clean the receptacle;
Mount the inspection hatch.
Cleaning and refilling the syphon
Remove the syphon (3) from the con-
densate connection;
Clean and fill it with fresh water;
Mount the syphon back in the original
position.
1
2
3
Water pressure and quality
Check if the water pressure and quality
meet the requirements. Consult the
chapter “commissioning: water and
hydraulic system” for more detailed
information.
Water flow rate
Check if the water flow rate through the
boiler is within the limits. Consult the
chapter “commissioning: check water
flow” for more detailed information.
Combustion analysis
Check the combustion at full load and
minumum load, correct the settings if
necessary. An additional reference
check at 50% load is recommended.
Consult the chapter “commissioning:
combustion analysis” for more detailed
information.
Gas pressure
Check the dynamic pressure of the gas
supply to the boiler, when the boiler is
running at full load. In case of a boiler
cascade, all boilers should be running
at full load. See technical data for re-
quired values.
Combustion analysis
Check the combustion at full load and
minumum load, correct the settings if
necessary. An additional reference
check at 50% load is recommended.
Consult the chapter “commissioning:
combustion analysis” for more detailed
information.
Gas pressure
Check the dynamic pressure of the gas
supply to the boiler, when the boiler is
running at full load. In case of a boiler
cascade, all boilers should be running
at full load. See technical data for re-
quired values.