Service manual

CONTROL SYSTEM
11.3 General Operating Rules
11.3.1 Initialization
Initialization process is the first operation done each time power is up.
The targets of the initialization are:
Addressing
of IDU’s
Identificat
ion of connected IDU’s
IDU Matchin
g Check
EEV’s homi
ng (reset position)
Restoring Parameters from EEPROM/Jumpers/
Dipswitches
11.3.1.1 IDU’s Initialization
11.3.1.1.1 Capacity Codes Setting
The capacity groups of the IDU’s are translated into capacity codes according to the
following tab
le:
Capacity group
Capacity Code
0 (2.0 - 2.9kw) 1.2
1 (3.0 - 3.9kw) 1.5
2 (4.0 - 4.9kw) Reserved
3 (5.0 to 60) 2
4 (6.1kw and above) 3
11.3.1.1.2 IDU Matching Check
The following procedure comes to verify that the total capacity of connected indoor units is
suitable for t
he capacity of the outdoor, and that indoor units with a large capacity are
connected to the channels with EEV and refrigerant tubing that is suitable for large
capacities.
Compare IDU’s family and capacity code to the values stored at the EEPROM.
If more then one IDU is connected (multi split application), the following items
should be checked:
o Code
A
≤ 1.5
o Code
B
≤ 1.5
o Code
C
≤ 1.
5
o Code
D
≤ 2
o The sum of IDU codes ≤ ODUCodeLimit
11.3.1.1.3 IDU’s Initialization Faults Definition and System Response
Fault Activity Fault Display System response
Missing IDU Update new IDU status stored at the
EEPROM.
System configuration
Changed
Change in IDU
Family/Capacity
Group
Fault will be stored in EEPROM as
an in
active failure of the specific
IDU
System configuration
Cha
nged
IDU Code Exceed
Limit
Fault will be stored in EEPROM for
the specific IDU
System Configuration
Problem
System will
switch to SB
Total IDU Code
Exceed Limit
ODU fault will be stored in
EEPROM
System Configuration
Problem
System will
switch to SB
11-4
Revision 0