User Manual
INSTALLATION
6
TOOLS REQUIRED
SPIRIT LEVEL
TAPE MEASURE
DRILL
180 or 182mm CORE DRILL
8mm MASONRY DRILL BIT
PENCIL
BEFORE STARTING INSTALLATION, PLEASE ENSURE YOU HAVE ALL SUITABLE EQUIPMENT
AVAILABLE AND UNDERSTAND THE STEPS INVOLVED IN INSTALLATION. IF IN ANY DOUBT,
PROFESSIONAL ADVICE SHOULD BE SOUGHT.
THE INSTALLER MUST ENSURE THAT THE PLANNED POSITION OF THE AIR CONDITIONER IS
SUITABLE, AND THAT THERE ARE NO CABLES, PIPES OR OTHER OBSTRUCTIONS, WHICH
WOULD PRESENT A DANGER AND/OR PREVENT COMPLETION OF INSTALLATION.
25mm MASONRY DRILL BIT
SHARP KNIFE