Make Up Air II Installation Manual

05/21/2019 7 EI914
Mechanical Installation
This product is designed for zero clearance, but use the following mounting and spacing criteria:
1. Unit can be installed vertically or horizontally. When vertical, inlet must face down.
2. When using CT doughnut, use Class II low voltage wiring methods to connect CT to Make-Up
Air unit.
3. The sides, any location, can be in direct contact with wood framing materials.
4. No materials shall be in contact with the cabinet housing which has a flame point less than wood,
300°F (150°C).
5. Product shall be installed in a conditioned space only.
6. Heating is locked out when entering air temperature is > 55°F (12.8°C).
General:
1. Select a location which will provide minimal noise vibration and minimal blower noise to the
building occupants.
2. The outside hood and ducting material are not included with this unit. It is the installer’s
responsibility to provide the necessary weather protection for the inlet.
In cold climates, insulated ducting must be used between the outside inlet air hood and the
inlet of this unit.
3. Install unit with a slight air inlet incline (housing outlet end is ¼” higher than inlet end).
4. The unit can be mounted within the ceiling (between joists where it will fit) or ceiling hung, at
any convenient location between the outside inlet hood and the fresh air discharge connection.
The “discharge connection” is wherever the conditioned fresh air is distributed within the
building – furnace cold air return, special ducting, hallway register, etc.
5. The inlet and outlet ducting size is specified according to the model size and is shown in the
Dimensional Drawings
section of this manual.
Note: In cold climates, frost and or condensation may collect on metal parts of this product. External field
provided insulation may be required in certain situations. The inlet damper and insulated inlet piping will
prevent cold air migration and a slight incline will keep moisture collection at the inlet end.