Make Up Air II Spec Sheet

Installation Specifications (Reference Installation & Operating Instructions, EI916 or EI917)
This product is designed for zero clearance, but use the following mounting and spacing criteria:
1. Unit can be installed vertically or horizontally. When vertical, inlet must face down.
2. When using CT doughnut, use Class II low voltage wiring methods to connect CT to Make-Up Air unit.
3. Make mounting provisions for a 1” air space at the top.
4. The sides, any location, can be in direct contact with wood framing materials.
5. No materials shall be in contact with the cabinet housing which has a ame point less than wood, 300° F (150° C).
6. Product shall be installed in a conditioned space only.
7. Heating elements are locked out when entering air temperature is > 55° F (12.8° C).
%,%#42/ġ).$5342)%3ġ).#
-/.4)#%,,/ġ-.ġ


0$/('8&7

0$/('8&7



$

[

'28%/(.12&.287




'(7$,/$
02'(/6(00(0)0*
0$.(83$,5
$57
5HY.
6KHHWRI