Spec Sheet

ELECTRO INDUSTRIES, INC.
MONTICELLO, MN 55362
D
E
MODEL
DIMENSION
"A"
DIMENSION
"B"
DIMENSION
"C"
DIMENSION
"D"
DIMENSION
"E"
DIMENSION
"F"
EM-WE1025H 13.38" 10.94" 9.86" 4.91" 2.93" 7.75"
EM-WE1025L 13.38" 10.94" 15.64" 4.91" 2.75" 7.88"
EM-WE1535H 13.38" 10.94" 9.86" 4.91" 4.43" 7.75"
EM-WE1535L 13.38" 10.94" 15.64" 4.91" 4.25" 7.88"
EM-WE2035H 13.38" 10.94" 9.86" 4.91" 5.93" 7.75"
EM-WE2035L 13.38" 10.94" 15.64" 4.91" 5.75" 7.88"
EM-WC0515H 5.16" 9.25" 9.86" 2.07" 1.43" 7.75"
EM-WC0515L 5.16" 9.25" 15.64" 2.07" 1.25" 7.88"
EM-WC1025H 13.38" 10.94" 9.86" 4.91" 2.93" 7.75"
EM-WC1025L 13.38" 10.94" 15.64" 4.91" 2.75" 7.88"
EM-WM1134H 13.38" 10.94" 9.86" 4.91" 4.43" 7.75"
EM-WM1535L 13.38" 10.94" 15.64" 4.91" 4.25" 7.88"
EM-WM1536L 13.38" 10.94" 15.64" 4.91" 4.25" 7.88"
EM-WM2035L 13.38" 10.94" 15.64" 4.91" 5.75" 7.88"
SPECIFICATION DRAWING
CUSTOMER DUCT HEATER
ART-278-00 2.0
1.75 X 1.375
DOUBLE KNOCKOUT
DOUBLE KNOCKOUT
C
.875
1.75
DOUBLE KNOCKOUT
1.375 X
1.125 X
F
B
A
.875
DOUBLE KNOCKOUT
X
1.125
DOUBLE KNOCKOUT
.875 X
1.125
1.75 X 1.375
DOUBLE KNOCKOUT
Installation Specifications
When installing this duct heater, NEC 424, Part IV, Duct Heaters, applies.
When installed in an “inline” duct or round pipe adapter for a general distribution boost heater or make-up air application, observe
the following guidelines:
1. This product must be installed in a metal duct, size of element rack.
2. There shall be no insulation on the inside of this sheet metal duct section.
3. Any ex-pipe or other insulated pipe must be at least 24” from the electric element.
4. Mounting - there must be at least 2” air clearance around all sides of this sheet metal duct section.
5. If there is a need to insulate this duct section for moisture condensation or in an unheated compartment, it is permissible to
wrap insulation around the exterior of this metal duct section.
6. The control box must be positioned so it will not receive dripping water or collection of moisture.