Operating instructions
02/14/2006 11  NI806 
Cooling, Special Dehumidification 
The BK tab and the BK peg jumper provide the industry standard 12% blower speed reduction to “pull 
out” additional moisture from the air. Provide an external humidistat between BK and R and pull or 
permanently disconnect the BK jumper. With the BK terminal at 0 volts the 12% blower speed reduction 
is activated. 
Utility Load Control 
If applicable for your installation and your utility authorized electric rate, at the bottom of the control 
board is a blue wire jumper. Simply remove this jumper and extend the two tabs to the power company 
receiver having N.C. logic. 
  If opposite control logic is required contact factory for other wiring instructions. 
Setup or Programming 
Electric Furnace Control – Inside View, Right Board 
Room Thermostat Type 
On the control board left side is a peg jumper which must be for conventional heat/cool. 
Heat Blower Speed Selection 
On the right side is a peg jumper for a LO/MED/HI selection. If 1035 CFM is not adequate, jumper E to 
W. 
  10 kW LO 600 CFM 
  15 kW MED 900 CFM 
  20 kW HI 1035 CFM 
Cool Minimal Blower Speed Selection 
At the control board right side is A/B/C/D selection. It is very important that this selection be matched to 
the cooling ton installed within the system. This is independent of the heating as outlined and setup 
above. 
  A – 3-3.5 ton 1200 CFM 
  B – 2.5-3 ton 1100 CFM 
  C – 2-2.5 ton 1000 CFM 
  D – 2 ton 900 CFM 
Operation Indicators 
Heat Sequencing Board – Inside 
Green LED 
When illuminated proper 24 volts are available. 
Red LED’s 
Each represents the proper stage on. 
HL Red LED 
Illuminates with hi-limit and interrupt of electric elements. 










