Operating instructions
02/14/2006 2  NI806 
Inlet Cabinets 
Factory optional cabinets can be configured with this Electric Furnace. Typically these are designed for 
upflow applications; however, the heat pump coil cabinet could be used in other positions. 
Side Entry, Filter Cabinet 
Return air can be ducted into either side, 15-⅜” x 
19” cutout hole is provided with one filler plate. 
Easy access door for checking and changing filter. 
Adjustable rails are provided for standard 4” x 20” 
x 20” pleated filter. 
Filter examples include Honeywell 203721, BestAir 
HW2020, or Grainger
®
 6B936. 
Standard 1” filter (20” x 20”) – field installer could arrive at filter filler bracket for slip-in within the 
provided rails. 
Comment – The 3M MERV filter airflow resistance needs to be considered in duct design 
calculations. Per specification information from 3M the static pressure drop across the 1”, Series 
1000, MERV 11 filter is 0.2” SP. 
Hydronics Coil and Cabinet 
The inlet cabinet includes a water coil with 
parameters shown. The return air connection must 
be on a side which allows coil draw-through. The 
cabinet can be reversed for either left or right side 
entry. The inlet for this cabinet is sized for an 
externally installed packaged return air filter cabinet 
– typical 20” x 20” size. 
1.  Nominal or rated Btu/h, 50,000 
2.  Recommended CFM setup, 1100 min. 
3.  Inlet water 120° at 10 GPM minimum. 
4.  Expected outlet air temperature, 115° 
Reduced CFM and/or inlet water temperature will 
reduce Btu/h rating. 










