Manual

[
CONNECTINGTHE DUCTWORK
[] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] []
LOWER
FLUE
8" ROUND
METAL
DUCT
RETAINING
SCREWS
Figure 14
1 Use 8" round metal duct to connect the discharge collar on the hood to
the ductwork above,
2 Use duct tape to make all joints secure and air tight,
3 Remove the two temporary retaining screws from the lower flue and set
it in place on the hood,
4 Secure decorative flue to hood with two mounting screws (3,9 x 9,5mm),
pan head mounting screws.
MOUNTING
Figure 15
R IIII,AClNGTHEBO TRIM
[] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] [] []
1 Remove the four (4) screws from the inside of the hood.
2 Remove the trim by pulling downward.
3 Slide the new trim upward into hood.
4 Replace the four screws inside hood.
Figure 16