User manual

6GB
11
12a
320
X
116
1÷2
116
650 min.
7.2.1
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre of
the area in which the hood will be installed.
Draw a horizontal line at 650 mm above the hob.
Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the
centre (notch) with the vertical reference line.
Mark the wall at the centres of the holes in the bracket.
Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper
chimney section supplied), aligning the centre (notch) with the vertical line.
Mark the wall at the centres of the holes in the bracket.
Mark a reference point as indicated at 116 mm from the vertical reference line and 320 mm above
the horizontal reference line.
Repeat this operation on the other side.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Fix the lower bracket 7.2.1 using the 12a screws (4,2 x 44,4) supplied.
Fix the upper bracket 7.2.1 and the air outlet connection support 7.3 together using the 2 screws
12a (4,2 x 44,4) supplied.
Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 5-6
mm between the wall and the head of the screw.