Quick Start Manual

6
List of Materials
List of Materials
Parts included in your hood
Hood structure assembly with blower, transition.
4 Lamps already installed.
4 Duct covers.
2 Bottom.
2 Top.
Hardware bag with:
Ceiling Mount Template
Use, care and installation guide
Wood screws (4 pieces - 3/16 x 1” 3/4)
Assembly screws (74 pieces)
4 Plastic Springs to attach duct covers
8 Vertical supports.
2 Upper Ductcover supports.
2 Horizontal supports.
Optional accessories
Recirculation KIT
Tools/Materials required
Aluminum tape
Wire nuts
Tape to mount template
8 rounded metal duct (length to suit installation)
Measuring tape
Pliers
Gloves to protect against sharp edges
Knife
Safety glasses
Electric drill with 5/16 and 3/8 bits
Strain relief 1/2 conduit connector
Level
Phillips (Pozidrive) # 2 screwdriver + torx # 2
Wire cutter/stripper
Masking tape
Hammer
Saw, jigsaw or reciprocating saw
1/2” electrical connector (junction box)
Lamp
Vertical
supports
Duct cover
support
Upper
Duct cover
supports
Duct
Covers
Grease
Filter