Installation manual

25
Installation
Steam installation
Before start
The steam pipe must be cut off and must not be
under pressure.
Steam
Steam 3-10 bar absolute pressure (130- 180°C).
Steam forward
1. The branch pipe’s branch must be located at
the top of the main steam pipe to prevent con-
densation in the steam.
2. The branch pipe must have a descending gra-
dient and must end at a height above the inlet
connecting branch (5). For measurements M,
N and O, please see dimension sketch
page 7.
3. Mount a plug valve (a) and a dirt collector (b)
in the branch pipe.
Condensation return
1. It is important that the branch pipe for conden-
sed water on return to the main condensate
pipe has a descending gradient and is lower
than the outlet connecting branch (6).
2. Mount a dirt collector (b) in the return pipe.
3. Mount a mechanical water discharger behind
the dirt collector (c).
4. Then mount a plug valve (a).
5. Mount pressure hoses between branch pipes
and dryer (hoses are not supplied).
W00066
14
6
5
M
N
O
b
a
b
a
c
14
14