Maintenance Guide Part 4

NeTIS MAINTENANCE GUIDE – Version 1.1 117/139
Confirm success
Once the new key is entered (red circle figure 8), validate, and the network management
terminal automatically disconnects. To check its success just test the equipment functions,
look at the programme return in the window (red circle figure 9) or check the 'ACT' LED on
the equipment. The LED should flash slowly (frequency of 2 or 4 seconds).