Installation manual for: 2102D20C/RC Dimensions :D20"H20"L9 Collection : Cabaret Bulb Type : G9 bulb, include bulb Total Weight : 33.88 LBS T Thank you for choosing our exquisite products. We are providing the finest quality crystal products for our customers. Our master designers and craftsmen intend to give a professional insight on our priority. We enclosed detailed instructions on how to install your light fixture properly. Please read all instructions carefully and thoroughly.
102D20 D20"H20"L9 SAFETY ‘Warning: MAKE SURE THE ELECTRICITY TO THE WIRES YOU ARE WORKING ON IS SHUT OFF.BY EITHER REMOVING THE FUSE OR TURNING OFF THE CIRCUIT BREAKER. CAUTION Before assembling the lighting fixture, please read all instructions carefully. All frame & crystal components are fragile, please handle with care. Required supply circuit : 110 130V/60Hz Labeled wires live neutral GND. Never install fixture on damp ceiling, the room should be dry and well ventilated.
2102D20 D20"H20"L$ Elegant Lighting Warranty The finish and frame of your new chandelier or fixture are warranted for a period of two (2) years from the date of purchase. Our company will, at its option, repair or replace any frame that has a defect in the materials or workmanship during the warranty period. All crystals are guaranteed for their original quality during the life of the chandelier. Breakage is not covered by this warranty.
2102D20 D20"H20"L9 Part Picture Description Check list | P22 mee: M10 Lock washer 9 | P23 — M10 Washer 9 | P24 ph Cable tic 2 | P25 Junction caps 2 | P26 0 Heat shrink tubing 2 | P27 GO Cable buckle 2 | P28 QD M10 Nipple 1 [ P29 E Hickey 1 | P30 5 Screw 1 [ P31 = Plate 1 [ P32 [= Screw 4 | P33 E> GS Bulb 11 2102D20 D20"H20"L$ Frame Assembly Diagram POS P10 REE ERIS} ARPRIICRNPONP
2102D20 D20"H20"L9 Cleaning and Maintenance of Chandelier Frame The finish on our chandelier frames and fixture frames is protected by a durable coating of lacquer. To clean, use a clean soft, dry cloth.Do not use any metal polishes, cleaners, abrasives or any substance which could remove the protective finish. Failure to follow these instructions automatically voids the guarantee.
2102D20 D20"H20"L9 Step 2 IMPORTANT: Test sockets with bulb before dressing the fixture. 1 .Attach the Mounting bracket) to the electrical boxcar. 2 Pull wires up through the Junction Capsize. 3 Attach the Canopy) to the Ceiling panel. 4 Make the electrical connections as detailed in the drawing above. Canopy Installation Instruction "L" = Hot wire "N" = Neutral wire "E" = GND 2102D20 D20"H20"L9 Step 3 } Frame Assembly Instructions Installation: Please read all instructions carefully.