348 wal noun) boner PART LIST 1. Elbow 2. Faucet body 3. Shower cradle 4 Hose 5. Hand shower Installation instructions WARNING: Always turn off hot and cold water before starting. Usa Teflon or pips compound on all water connections. A Place mounting legs on the tub, then titan the lock nubs from underneath and connect the water supply lines. Place washers and then tighten the coupling nuts on to the mounting legs. B. Use Teflon tapes on the threads of the mounting legs.