Manual
-73-
Project 141 Box Circuit
Assembly (adult supervision recommended):
1. Place battery holder (B3) and base grid supports on
base grid A.
2. Place parts on base grids B & D, and install into base
grid supports on grid A. The pegs should be facing
inward.
3. Install grids C & E into base grid supports on grid A,
attaching the 4 vertical snap wires (V1) as you do it.
4. Add the 4 stabilizers to help secure grids B-E together.
5. Place the remaining parts on grids A, C, & E.
Turn on the slide switch (S1) to light the LEDs (D6 & D8).
This circuit can also be used
to store all your SC-3Di
parts.










