Manual

-75-
Project 143 Outer Lights House
Assembly (adult supervision recommended):
1. Place base grid supports on base grid A.
2. Place parts on grids B & C (except jumper
wires), and install into base grid supports on
grid A. The pegs on grids B & C should be
facing outward.
3.
Place parts (except jumper wires) on grids A & D.
4. Mount grid D on top of grids B & C using 4
stabilizers.
5. Add the jumper wires (2 blue, 1 red, and 1
black. Since the blue wires are short, be sure
to put them through the holes in grid C, as
shown in the pictures on the right.
Turn on the slide switch (S1) to activate the
LEDs (D6 & D8), and light tunnel (U30).