Data Sheet
-30-
Assembly (adult supervision highly recommended):
1. Place base grid supports on base grid A.
2. Mount parts on grids B & C and install in base grid supports in grid A.
The pegs should be facing inward. Do not use the double-sided grid.
3. Place remaining parts on grid A.
4. Mount grids D & E at the angles shown and with pegs facing down, on
top of grids B & C using six stabilizers, attaching the two angled snap
wires (V2) and two 90 degree vertical snap wires (V1) as you do it. Note
that grid D is the double-sided grid. Adjust the positions of the stabilizers
as needed.
5. Add the remaining parts on grids D & E.
Turn on the slide switch (S1). The clear motor (M4) spins a ceiling fan,
the melody IC (U32) plays a tune, and the lamp (L4) lights.
Use the preceding circuit, but carefully add parts on the top side of grid
D, as shown. If desired place the LED attachments on the LEDs.
Project 39
Vaulted Ceiling House
with Roof Lights
LED
Attachments
SC-3DMEG_Manual.qxp_SC-3Di_Manual_060816 6/19/17 7:30 PM Page 31










