Data Sheet

-91-
Project 159
Super Tower
Assembly (adult supervision highly recommended):
1. Place the base grid supports on base grid A.
2. Place parts on grid B (except the jumper wires) and install into base grid supports on grid A.
3. Install remaining parts on grid A except the blue jumper wire.
4. Install grid C onto grid B by placing the 2 stabilizers and 2-snap wires that connect them.
5. Install grid D onto grid C by placing the 2 stabilizers and 2-snap wires that connect them.
6. Carefully install parts on grid E (which is the double-sided grid), and install onto D. Check
everything to make sure the structure is stable.
7. Connect the jumper wires.
Turn on the slide switch (S1); the LEDs and lamp light, and the melody IC makes sound.
SC-3DMEG_Manual.qxp_SC-3Di_Manual_060816 6/19/17 7:34 PM Page 92