Install Instructions Ola Platinum Wave

12
8. Note: All fastener location must span the studs
otherwise proceed as follows:
Cutout drywall along marked lines. Install wood blocking
between studs and make sure it is flush with existing
stud front. Make sure all mounting screws will anchor to
added studs. Replace drywall and refinish.
9. Determine the required height for the conduit and cut a
1-1/4" (3.2 cm) hole at this location.
Run wires through hole according the National Electrical
Code or CSA Standards and local codes and
ordinances.
There must be enough power supply cable from the
fused disconnect (Or circuit breaker) box to make the
connection in the hood’s Junction box/es.
Use caulking to seal all openings.
Do Not turn on power until installation is completed.
10.Remark center line and hood bottom on same location as
before and tape template on wall as in step 4 above.
11. Drive “upper” wood screws (Supplied in mounting
hardware kit) on locations marked on template. Leave ¼
“ of distance between the screw head and the wall, then
remove template..
12. Mount the support bracket onto the “upper” screws.
Drive and tighten the “upper” wood screws, by hand.
Drive and tighten the “lower” wood screws, by hand.
13. Remove the aesthetic tab.
14. Mount the hood onto support bracket.
a. Secure hood with 4 screws.
b. Apply the wall model aesthetic tab, supplied in
mounting hardware kit.
15. Apply the aesthetic cap to cover the hood, passing the
interconnection electrical cable inside.
Important: Arrange the excess part using the cable
clamps located at the top of the hood.