Manual SRM Pro Series Premium Quality Manual Pull-Down Projection Screen User’s Guide 11/02/16 www.elitescreens.com/info@elitescreens.
1. 2. Carefully unpack the screen. Always handle the screen in a leveled position on a clean surface. A. Flush Wall Mounting 1. Mark the location of where the screen is to be installed for the pre-drilled hole. 2. After marking the area and drilling the hole, insert the proper screw into the drilled hole and leave about 1/8” of an inch from the wall to mount the screen. 3. Mount your screen from the keyhole located on back of screen’s left and right end cap.
SCREEN OPERATION Note: Always pull the screen down or let it up in a 90-degree vertical angle. Do not allow the screen to touch the screen case when the screen goes up or comes down to avoid damaging the screen material. 1. Pull the screen down from the lanyard or from the handle only in a 90-degree angle. Do not attempt to pull the screen down by the surface or touch the screen, as it will damage the screen and void the warranty.
Clean matte white screen material with a soft cloth and mild soap with water. When not in use, retract screen in its housing to keep the screen material surface clean. Regardless of mounting method, the screen should be securely supported so that vibration or even abusive pulling on the viewing surface will not cause the case to work loose or fall. The installer must insure that the fasteners used are of adequate strength and suitable for the mounting surface chosen.
Limited Warranty Policy What is Covered: Elite Screens, Inc. (“Elite Screens”) warrants its products to the first retail purchaser, if purchased new and operated in the United States or Canada, to be free from defects in workmanship and materials (except as provided below) for a period of (2) years from the date of original purchase, and (3) years for products purchased directly by educational, non-profit, religious or government organizations.