User Guide

03/16/17 - DR www.elitescreens.com
3
Front Side
Step 6. Carefully unroll the screen material face-down on, top of the assembled frame, from one side of the frame to the other side as shown below.
Step 7. Insert the four horizontal and two vertical Tension Rods (k) into the corresponding sides of the screen material, while keeping the material
laying flat. Careful not to snag on the holes at the edge of the material during this process; forcing the rods may damage the screen material.
Step 8. Insert the Springs (b) into the grooves of the frame. Line them up with the corresponding holes in the materials edge. The shorter hook on
each spring should be placed in the frame's groove, as shown below. For the correct amount of springs to place into the frame, please refer to the
table listed below.
Step 9. With one end of the spring placed inside the groove of the frame, hook the Spring (b) through the hole located on the screen material’s
outer edge. Be sure to hook the Springs (b) onto the Tension Rod (k) to avoid damage to the screen material. Use the Pull Hook (f) when
necessary. Attach the springs at the four corners (1).
Screen
Size
Qty
Horizontal
Spring
Vertical
Spring
92”
22 13
100”
24
14
110”
26
15
120”
28 16
135”
33
19
150”
38
20
180”
42
24
200”
48
28
1
1
1
1