Installation Guide

Assembly Instructions for BF01-05
NOTE: WRAP AT LEAST 3 LAYERS OF TEFLON TAPE ON ALL THREADED CONNECTIONS
1. Shut off the water supply valves before installation.
2. From the top , insert the valve bodies into the holes into on the sink, with hot on
the left and the cold on the right. (NOTE: THE O-RING ON THE BROACHES
ARE BLUE FOR COLD AND RED FOR HOT).
3. From undermeath, thread the mounting nuts onto the threaded shanks and
tighten tight.
4. Connect the supply lines (not included) to the threaded shanks.
5. Install handles. After installation in completed, turn on the water supply valves
and allow both hot and cold water to run at least on minute each. While water
is running, check for leaks, especially at hook-ups to supply lines. Tightening
nuts slightly will stop any minor leaks.
Assembly Instructions for Handles
Lever Handles:
1. Be sure that the broach screws are tightened before installing the lever handles.
2. Install the lever handles on the broaches and tighten the set screws using the allen
wrench provided.
Cross Handles:
1. Remove the screws from the top of the broaches.
2. Remove the insert caps from the cross handles.
3. Put the cross handles on the broaches and then tighten the screws. Insert the caps on
the cross handles.
Broach
Broach
Screw
Set
Screw
Allen
Wrench
Red O-Ring
Blue O-Ring
Cold Valve Body
Hot Valve Body
Mounting Nut
Cone Washer
Friction Ring
Supply Line Nut
Elizabethan
Classics
R
Rev.D
NOTE: TO BE INSTALLED ONLY BY QUALIFIED, LICENSED PLUMBER
CAUTION: DO NOT OVER TIGHTEN NUTS - THIS CAN LEAD TO STRIPPING
OR CRACKING AND WILL VOID YOUR WARRANTY.
AND SCREWS

Summary of content (1 pages)