Installation
1000001943 (Rev. C - 03/19)
For Technical Service, please contact us at 1.800.476.4106
Elkay - www.elkay.com
Halsey Taylor - www.halseytaylor.com
MFWSF100 / MFWSF120 MOUNTING FRAME INSTRUCTIONS
5. Mounting Frame Wiring Instructions:
a. Turn off electrical supply to installation location circuit.
b. Remove Junction Box Cover to gain access to electrical box.
c. Connect electrical supply using conduit, wiring, and connectors per local and national codes.
d. Connect ground wire to ground screw (provided).
e. Connect black wire to ”hot” power supply line 120V 60Hz, 1 phase.
f. Connect white wire to Neutral line.
g. Replace Junction Box Cover.
h. Connect electrical power to installation location circuit.
1. Cut a square rectangular wall opening 18 3/4” (476mm) W x 31 3/4” (806mm) H and 25” (635mm) above
the oor line. These dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI
standard A117.1.
2. Reinforce the wall opening on all sides so that it will adequately support the water fountain. This reinforcement
must support up to 150 lbs static load and provide a means for securing the frame assembly in place.
3. Install plumbing rough-ins.
4. Remove frame assembly and related hardware from packaging. Install the frame squarely in wall opening with
frame upright edges ush with the nished wall face. Secure the frame to the wall using (10) 5/16” bolts
or screws (not provided). Tighten securely.
NOTE: Be sure that frame is squared in location. Do not use less than required screw quantity and size.