Final Inspecons
Aer both the electrical and plumbing installaon are done, a final inspecon of these parts
needs to be completed before finishing the installaon.
Close the drain and fill the walk in tub unl it is up to a normal water height level which is 1”
to 2” below the overflow and drain lever.
Allow the water to stand in walk in tub for 30 minutes and then inspect all plumbing and
seals for leaks. If there are any leaks or concerns call 1-800-480-6850.
If the walk in tub is jeed, supply electricity to unit and run for 10 minutes then inspect for
leaks. Inspect the unions around the pump; if leaks persist from the unions aer ghtening;
loosen the unions and insure that the O-ring is seated properly.
If the pumps do not operate check the breaker to insure power is on and the cable connecng
the controls to the pump is aached.
Ensure all jets are opening and working. Make sure they operate at all speeds.
Overflow and Drain lever
CLOSED OPEN